Our own carpentry factory in Johor, Malaysia. Not a subcontractor — our floor, our foremen, our shop drawings. What is specified is what gets installed, and when something needs to change on site it changes in days, not weeks.
Smart home, engineered at drawing stage. We work closely with Aqara and Near, and we plan lighting scenes, climate, blinds, access and sensors before a single conduit is laid — not retrofitted once the ceilings are closed. Most renovations add smart home last. That is why most of them disappoint.
Imported modular kitchens and wardrobes. European-standard systems from Brun SG and modular+, specified, coordinated and installed by the same team that drew them — with the site work around them built to suit, rather than the other way round.
About the studio
